1. Appearance and Connection Inspection: Conduct a comprehensive inspection of the storage tank's appearance, confirming no deformation, damage, or paint peeling. Inspect the sealing performance of each connection point, checking flanges and interfaces for leaks, ensuring seals are properly installed and tightly fitted. Simultaneously verify the installation of accessories, confirming that level gauges, pressure gauges, valves, and other components are securely connected without looseness, ensuring all components are in proper assembly.
2. Sealing Test: Conduct a water or gas filling sealing test, selecting the appropriate method based on the characteristics of the medium being used. Slowly inject the test medium, gradually increasing the pressure to the specified standard. After maintaining a stable pressure for the specified period, observe the tank and connections for any leaks, pressure drops, or other abnormalities. Monitor the entire test process; if any leaks are found, immediately stop the operation, repair the leaks, and retest until the sealing performance requirements are met.
3. Auxiliary System Commissioning: Start the storage tank's auxiliary control system and monitoring equipment, adjusting the accuracy of the level monitoring device to ensure accurate and timely data feedback. Check the flexibility and effectiveness of valve opening and closing, and verify the smooth operation of the sewage, feed, and discharge systems. Simultaneously, debug the anti-corrosion and insulation facilities to ensure they meet the requirements of the operating conditions and guarantee the coordinated operation of the auxiliary systems and the main tank.
4. No-load and Load Trial Run First, conduct a no-load trial run to check the operating status of each component and the stability of the equipment, eliminating abnormal noises, jamming, and other problems. After passing the no-load test, conduct a load trial run, injecting the medium according to the actual operating conditions and monitoring the overall operation of the tank, pressure changes, and the coordinated effect of each system. After the trial run, conduct a comprehensive inspection; if no abnormalities are found, it can be put into normal use.